Taiwan Railway Adminstration for the Expansion of the Third Rail Construction between Zhangshu Bay and Nangang
In order to comply with Taiwan Railway urban development master plan smooth the operation of train dispatching, the project expanded the railway to three railroad system from Qidu District to Nangang District.
Showroom: 56A Huynh Van Luy, Phu Loi ward, Thu Dau Mot City, Bình Duong
Tel: (+84) 0274 6512 472
Ho Chi Minh: 458 Luy Ban Bich, Hoa Thanh Ward, Tan Phu District, HCM City
Tel: (+84) 028 66 533 833